How to Plan a Renovation Budget in Dubai

Most renovation overruns in Dubai come from three things: an unclear scope, changes made during the works and costs nobody listed at the start. This guide shows how to build a realistic budget before you sign anything.

Updated September 2026 · 7 min read · By M&A Interior Design, Dubai Marina

Key takeaways
  • Decide the scope room by room before asking for quotes.
  • Add 5% VAT, design fees, approvals and furniture to the construction price.
  • Keep a contingency for things hidden behind walls and floors.
  • A fixed-price quotation with an itemised BOQ is the best protection against surprises.

Step 1: define the scope

List every room and what you want done there: replace, refresh or leave as is. Mark the must-haves and the nice-to-haves. The clearer the list, the more accurate every quotation will be.

Step 2: use realistic price ranges

ItemTypical range (2026)
BathroomAED 15,000–60,000+
KitchenAED 40,000–120,000
Studio / 1-bed / 2-bed apartmentAED 30,000–80,000 / 60,000–150,000 / 100,000–250,000
Partial / full villaAED 120,000–350,000 / 350,000–800,000+
Office fit outAED 300–1,500 per sqm
Interior design onlyAED 8,000–80,000+

For details see the villa, apartment, kitchen and bathroom cost guides.

Step 3: add the costs people forget

  • VAT at 5% on the contract value
  • Design and drawings, if not included in the contract
  • Approvals: building NOC deposits, authority permits and any consultant fees for structural changes
  • Furniture, curtains and appliances, if not in the contract
  • Temporary accommodation or storage if you move out
  • Contingency for issues found once walls and floors are opened

Step 4: protect the budget

  • Ask for a fixed price with an itemised BOQ, not a lump sum on one line.
  • Approve the design, materials and samples before work starts.
  • Agree in writing that any change is priced and approved before it is carried out.
  • Link payments to completed stages. See how to choose a renovation contractor.

The most expensive part of a renovation

In most homes it is the kitchen and bathrooms, because they combine cabinetry or sanitaryware, tiling, waterproofing and plumbing and electrical work. Structural changes and MEP upgrades can cost even more, but they are often invisible. That is why it pays to decide early which layout changes are really worth it.

Frequently Asked Questions

It depends on your goal. If you will live in the home for years, spend on what you use every day. If you plan to rent or sell, keep the budget in proportion to the property's value and local market.
Scope, the size of the property, structural or MEP changes, the level of finishes, approvals and the condition of what is behind the existing walls and floors.
Yes. Keep a reserve for issues that nobody can see before opening up walls and floors, such as old leaks, damaged screed or outdated wiring.
For homeowners, usually yes. A fixed price based on an itemised BOQ means the contractor carries the risk of their own quantities, and changes are only charged when you approve them.