Bathroom Waterproofing in Dubai: How It Should Be Done
Waterproofing is hidden under the tiles, which is exactly why it is where cheap renovations cut corners. A failed membrane means leaks into the apartment below, mould and tiles that have to come off again. This guide explains what proper waterproofing involves so you know what to ask for.
- Waterproofing must be redone whenever bathroom floor tiles are removed.
- The membrane should turn up the walls, and cover the full shower area.
- A flood test before tiling proves the membrane works.
- Ask for the waterproofing warranty in writing. Ours is 5 years.
Signs your bathroom waterproofing has failed
- Water stains or damp patches on the ceiling below, or complaints from the neighbour downstairs
- Loose, hollow-sounding or cracked floor tiles
- Dark grout, mould or a musty smell that returns after cleaning
- Peeling paint or swelling at the bottom of walls next to the bathroom
- Damaged door frames or vanity bases
How proper waterproofing is done
- Strip back to the slab and remove old tiles, screed and membrane where needed.
- Prepare the surface: repair cracks, form a proper fall to the drain.
- Seal the details: corners, pipe penetrations and drains get reinforcing tape or collars, which is where most leaks start.
- Apply the membrane in the specified coats across the floor, turned up the walls, and to full height in the shower area.
- Flood test: the floor is filled with water and left, usually for at least 24 hours, and checked for leaks before any tiling.
- Protect and tile without damaging the membrane.
Types of membrane
Common systems include cementitious membranes, liquid-applied polyurethane or acrylic membranes and sheet membranes. The right one depends on the substrate and the area; what matters most is that it is installed to the manufacturer’s specification with every detail sealed.
Showers, balconies and kitchens
Walk-in showers without a tray need extra care with the fall and the drain. Balconies and roofs face sun and heat, and need systems designed for exposure. Kitchens with floor drains or under-sink areas benefit from waterproofing too.
Our standard
Every bathroom we renovate gets a new membrane, sealed details and a flood test before tiling, backed by a 5-year waterproofing warranty in writing. Bathroom renovations in our published ranges run from AED 15,000 to 60,000+ and typically take 2 to 3 weeks. See our bathroom renovation cost guide.
Frequently Asked Questions
Talk to an architect about your project
Planning a project in Dubai? Our architect visits your site for free and sends a fixed-price quotation with an itemised BOQ, usually within 48 hours.
Book a free site visitWhatsApp us